{"id":1767,"date":"2019-01-20T11:33:31","date_gmt":"2019-01-20T10:33:31","guid":{"rendered":"https:\/\/betskiredj.com\/www\/?p=1767"},"modified":"2021-10-06T17:50:17","modified_gmt":"2021-10-06T16:50:17","slug":"implementation-bim","status":"publish","type":"post","link":"https:\/\/betskiredj.com\/www\/bim\/implementation-bim\/","title":{"rendered":"Le BIM, son impl\u00e9mentation et ses avantages"},"content":{"rendered":"\r\n<h1 class=\"wp-block-heading\">BIM: D\u00e9finition<\/h1>\r\n\r\n\r\n\r\n<div class=\"wp-block-image\">\r\n<figure class=\"aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" width=\"451\" height=\"221\" class=\"wp-image-1770\" src=\"https:\/\/betskiredj.com\/www\/wp-content\/uploads\/2019\/01\/F6A182E3-41FA-4AF5-832F-A9C9876D3923.png\" alt=\"\" srcset=\"https:\/\/betskiredj.com\/www\/wp-content\/uploads\/2019\/01\/F6A182E3-41FA-4AF5-832F-A9C9876D3923.png 451w, https:\/\/betskiredj.com\/www\/wp-content\/uploads\/2019\/01\/F6A182E3-41FA-4AF5-832F-A9C9876D3923-300x147.png 300w\" sizes=\"(max-width: 451px) 100vw, 451px\" \/>\r\n<figcaption>BIM et ses phases d\u2019intervention<\/figcaption>\r\n<\/figure>\r\n<\/div>\r\n\r\n\r\n\r\n<p>Le BIM, acronyme de Building Information Modeling (ou Building Information Management) est un ensemble de processus qui permet la cr\u00e9ation d\u2019un mod\u00e8le num\u00e9rique d\u2019un ouvrage \u00e0 construire (b\u00e2timent, pont). Les puristes parlent de BIMMM (Building Information Model, Modeling et Management).<\/p>\r\n\r\n\r\n\r\n<h1 class=\"wp-block-heading\">Avantages<\/h1>\r\n\r\n\r\n\r\n<p>Les avantages du BIM sont multiples:<\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li><strong>Mod\u00e8le partag\u00e9 entre les diff\u00e9rents intervenants des projets<\/strong> : l\u2019architecte, les bureaux d\u2019\u00e9tudes ( Structure, corps d\u2019etats techniques, environnement), les entreprises, le ma\u00eetre d\u2019ouvrage, la cellule OPC (Organisation, Pilotage et Coordination).<\/li>\r\n<li>Ce mod\u00e8le est au fur et \u00e0 mesure aliment\u00e9 par les diff\u00e9rents intervenants qui d\u00e9taillent au fur et \u00e0 mesure leurs sous-mod\u00e8les \u00ab\u00a0m\u00e9tier\u00a0\u00bb respectifs (Niveau 3)<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h1 class=\"wp-block-heading\">Digital Twin<\/h1>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li><mark>L\u2019ouvrage est construit sur un serveur data avant d\u2019\u00eatre construit sur site. le n\u00f4tre, <a href=\"https:\/\/betskiredj.com\/www\/client\/skengineeringlive\/\">Skengineering <\/a>int\u00e8gre le standard <a href=\"https:\/\/openbim.fr\/openbim\/\" target=\"_blank\" rel=\"noreferrer noopener\">O<\/a><\/mark><a href=\"https:\/\/openbim.fr\/openbim\/\" target=\"_blank\" rel=\"noreferrer noopener sponsored nofollow\"><mark>penBIM et des formats propri\u00e9taires de licences dont nous disposons<\/mark><\/a><mark>Ainsi, on peut d\u00e9tecter les interf\u00e9rences entre les m\u00e9tiers et adapter la conception pour \u00e9viter d\u2019avoir ces interf\u00e9rences sur le chantier.<\/mark> On parle de \u00ab\u00a0clash d\u00e9tection\u00a0\u00bb. L\u2019exemple le plus courant est l\u2019interf\u00e9rence des gaines de r\u00e9seaux avec les \u00e9l\u00e9ments porteurs de la structure<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\">4D Planification, s\u00e9quen\u00e7age et \u00e9tudes m\u00e9thode.<\/h2>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li><strong>L<\/strong>e mod\u00e8le peut inclure un planning 4D o\u00f9 l\u2019on lie le d\u00e9roul\u00e9 du planning avec le mod\u00e8le. Le mod\u00e8le s\u2019anime et cela permet une coordination intuitive. On peut ainsi d\u00e9tecter les erreurs de liaisons de t\u00e2ches (mauvaises ant\u00e9riorit\u00e9s,..,) et simplifier l\u2019organisation logistique<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\">5D Budg\u00e9tisation et suivi des avancements<\/h2>\r\n\r\n\r\n\r\n<p><strong>La budg\u00e9tisation ma\u00eetris\u00e9e <\/strong>: Le mod\u00e9le sert \u00e0 peaufiner l&rsquo;\u00e9tude de prix suivant les phases du projet. Ainsi ma\u00eetriser le co\u00fbt du projet est assur\u00e9 si tous les intervenants travaillent en bonne collaboration<\/p>\r\n\r\n\r\n\r\n<p>&nbsp;<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\">6D &#8211; Un process vert<\/h2>\r\n\r\n\r\n\r\n<p>L&rsquo;\u00e9valuation de l&rsquo;impact carbone du projet peut se faire : pendant la construction mais <strong>SURTOUT<\/strong> pour la phase de maintenance. En effet, la maintenance et l&rsquo;exploitation repr\u00e9sentent 80% des \u00e9missions de GES selon plusieurs \u00e9tudes mondiales qui se recoupent, notamment dans l&rsquo;industrie<\/p>\r\n\r\n\r\n\r\n<h1 class=\"wp-block-heading\">L\u2019 impl\u00e9mentation du BIM et ses difficult\u00e9s<\/h1>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">La difficult\u00e9 de son impl\u00e9mentation est d\u2019abord une affaire de m\u00e9thode.<\/h3>\r\n\r\n\r\n\r\n<p>Avec toute cette data qui doit \u00eatre g\u00e9r\u00e9e, agr\u00e9g\u00e9e et maintenue il est essentiel d\u2019\u00e9tablir de mani\u00e8re claire les r\u00f4les et les autorisations de modifications de chaque couche 3D. C&rsquo;est l\u00e0 m\u00eame le r\u00f4le d&rsquo;un BIM Manager<\/p>\r\n\r\n\r\n\r\n<p>La Coordination, quant \u00e0 elle, peut \u00eatre d\u00e9l\u00e9gu\u00e9e \u00e0 un technicien ou ing\u00e9nieur OPC, en fonction de la difficult\u00e9 du projet. Pour des projets de taille plus modeste, un technicien peut faire office de BIM Coordinator<\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>L\u2019expertise dans le BTP car pour manipuler des donn\u00e9es, on doit savoir comprendre les tenants et les aboutissants des donn\u00e9es<\/li>\r\n<li>Une expertise dans l\u2019informatique: en effet, derri\u00e8re ce mod\u00e8le se cache en fait une \u00e9norme base de donn\u00e9es et il faut avoir des notions pointues pour savoir l\u2019interroger, la modifier ou l\u2019enrichir<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p>Les BIM Managers (les vrais, ceux qui ont re\u00e7u une formation ad\u00e9quate) ont pour lourde t\u00e2che de coordonner le tout.<\/p>\r\n\r\n\r\n\r\n<p>La difficult\u00e9 de l\u2019implementation est aussi due au fait que chaque m\u00e9tier utilise ses propres logiciels, et qu\u2019il faut assurer que les infos de l\u2019un sont bien lues par l\u2019autre sans d\u00e9formation. C\u2019est l\u00e0 qu\u2019intervient l\u2019IFC, (Industry foundation Class), format de fichier libre de droit, qui permet l\u2019echange des informations entre logiciels.<\/p>\r\n\r\n\r\n\r\n<p>Le passage au BIM n\u00e9cessite un investissement cons\u00e9quent en formations et en logiciels.<\/p>\r\n\r\n\r\n\r\n<h1 class=\"wp-block-heading\">Chez BET SKIREDJ<\/h1>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">Interview de Nizar SKIREDJ, Directeur Technique, G\u00e9rant<\/h3>\r\n\r\n\r\n\r\n<p><em>ESITC Paris 2010, Hogskolan i Halmstad 2008, Zigurat Institute of Technology 2019, Universidad Autonoma de Barcelona 2019<\/em><\/p>\r\n\r\n\r\n\r\n<p>\u00ab\u00a0Nous impl\u00e9mentons le BIM depuis bient\u00f4t un an. Nos collaborateurs suivent une formation \u00e0 <a href=\"https:\/\/www.e-zigurat.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Ziggurat Institute of Technology<\/a> et \u00e0 l\u2019Universit\u00e9 Autonome de Barcelone. Ziggurat est un institut bas\u00e9 \u00e0 Barcelone, Londres, Duba\u00ef, Madrid, Rio de Janeiro &#8230; qui propose des formations BIM Managers sur 2 ans (Master).<\/p>\r\n\r\n\r\n\r\n<p>Pionnier dans le BIM, cet institut a form\u00e9 des milliers de BIM managers dans le monde et se positionne dans les \u00e9coles BIM les plus prestigieuses du monde.<\/p>\r\n\r\n\r\n\r\n<div class=\"wp-block-image\">\r\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"650\" height=\"385\" class=\"wp-image-1771\" src=\"https:\/\/betskiredj.com\/www\/wp-content\/uploads\/2019\/01\/40DE7DB4-FAA8-4C89-9E2D-8C14113AAD9F.gif\" alt=\"\" \/>\r\n<figcaption>Matrice de maturit\u00e9 BIM<\/figcaption>\r\n<\/figure>\r\n<\/div>\r\n\r\n\r\n\r\n<p>&nbsp;<\/p>\r\n\r\n\r\n\r\n<h1 class=\"wp-block-heading\">SK Engineering<\/h1>\r\n\r\n\r\n\r\n<p>Nous avons mis en place une m\u00e9thodologie qui nous est propre et avons lanc\u00e9 une GED (Gestion \u00c9lectronique des Documents) <a href=\"https:\/\/betskiredj.com\/www\/client\/skengineeringlive\/\" target=\"_blank\" rel=\"noreferrer noopener\">SkEngineering<\/a><a href=\"https:\/\/betskiredj.com\/www\/client\/skengineeringlive\/\"> Live<\/a>.<\/p>\r\n\r\n\r\n\r\n<p>Cette plateforme permet de s\u2019assurer que les flux de travail sont respect\u00e9s (workflows) et que chacun a acc\u00e8s \u00e0 la bonne data au bon moment.<\/p>\r\n\r\n\r\n\r\n<p>Nous avons aussi exp\u00e9riment\u00e9 le mod\u00e8le num\u00e9rique avec des architectes sur la structure et les corps d\u2019\u00e9tats techniques.<\/p>\r\n\r\n\r\n<p><iframe title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/LiBUBuGw9y8\" width=\"758\" height=\"426\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n\r\n\r\n\r\n<h1 class=\"wp-block-heading\">Le BIM Au Maroc<\/h1>\r\n\r\n\r\n\r\n<p>Nous manquons encore au Maroc d\u2019entreprises \u00e9quip\u00e9es pour en faire un \u00e9cosyst\u00e8me complet. Nous travaillons en collaboration avec des \u00e9coles, des centres de formations et des entreprises pour les aider \u00e0 franchir le pas.<\/p>\r\n\r\n\r\n\r\n<p>Nous esp\u00e9rons vraiment mettre \u00e0 profit nos connaissances dans ce domaine en travaillant avec des entreprises qui ont franchi le pas, des \u00e9coles pour former les futurs ing\u00e9nieurs de demain et des centres de recherche pour d\u00e9velopper la technologie.<\/p>\r\n\r\n\r\n\r\n<p><strong><em>Le cadre l\u00e9gal <\/em>doit aussi \u00e9tudier la question pour servir de garde-fou, et ce afin de prioriser les sp\u00e9cialistes dans leur sp\u00e9cialit\u00e9: Les architectes sont des architectes, les ing\u00e9nieurs sp\u00e9cialis\u00e9s sont sp\u00e9cialis\u00e9s<\/strong> dans leur champ de comp\u00e9tence.<\/p>\r\n\r\n\r\n\r\n<p>Nous sommes en cours de certification niveau 2 (2021) et avons d\u00e9j\u00e0 en impl\u00e9ment\u00e9 le niveau 3 sur certains projets. Nous formons continuellement nos collaborateurs aux nouveaux outils dont nous acqu\u00e9rons des licences.<\/p>\r\n\r\n\r\n\r\n<p>En conclusion, je dirai que nous sommes convaincus que le BIM n\u2019est pas un gadget technologique mais une v\u00e9ritable r\u00e9volution dans le domaine de la construction. D&rsquo;ailleurs, tous nos projets en 2022 ne seront fait qu&rsquo;en BIM.<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Le BIM, acronyme de Building Information Modeling (ou Building Information Management) est un ensemble de processus qui permet la cr\u00e9ation d\u2019un mod\u00e8le num\u00e9rique d\u2019un ouvrage \u00e0 construire (b\u00e2timent, pont). Les puristes parlent de BIMMM (Building Information Model, Modeling et Management).<\/p>\n","protected":false},"author":2,"featured_media":1772,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[231],"tags":[194,195,196,197,186,191,192,187,188,189,193],"post_folder":[],"class_list":["post-1767","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bim","tag-4d","tag-5d","tag-6d","tag-7d","tag-bim","tag-bureau-detudes","tag-coordination","tag-implementation","tag-maquette-numerique","tag-maturite","tag-plannification"],"acf":[],"_links":{"self":[{"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/posts\/1767","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/comments?post=1767"}],"version-history":[{"count":0,"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/posts\/1767\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/media\/1772"}],"wp:attachment":[{"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/media?parent=1767"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/categories?post=1767"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/tags?post=1767"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/betskiredj.com\/www\/wp-json\/wp\/v2\/post_folder?post=1767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}